Adding daily light across separate intervals
Turn the schedule into a dose
A single PPFD reading describes the rate of photon arrival at one moment. The daily light integral is the number of moles received per square meter across a day. When the fixture runs steadily and the setting stays fixed, the quick calculator uses one intensity and one duration. When the output changes or daylight contributes, use the period grid to keep track of the different exposures.
Schedule the rows on paper before moving to the editor. The tool checks that their durations fit within one day, but it receives no start and stop times and cannot detect two rows occupying the same hour. For a morning period with daylight and lamps running together, enter their combined observed or explicitly assumed intensity once. A separate daylight-only contribution would double-count that span if included again. If records cover only part of a day, document that distinction before calling the sum a full day.
Use average readings from the same surface
Choose a representative average for each interval and keep sensor height and position consistent. If an interval had cloud changes, averaging several readings weighted by the time they represent gives a better input than the brightest reading. A percent dimmer setting or a fixture specification in watts is not the PPFD delivered to the leaves. Record a measured dark period as zero if you want the rows to cover the full clock day. An unknown interval is a missing observation, so do not enter it as darkness.
Each contribution is the interval PPFD multiplied by hours and 0.0036. The factor converts 3,600 seconds per hour and divides by one million µmol per mol. The Results table shows the contribution from each period and a daily sum. Check the total entered hours first, then identify intervals that contribute unexpectedly much or little. A result of 0.00 can arise from zero exposure as well as rounding a very small dose.
Read a daily total together with its schedule
Two schedules may produce the same daily integral while exposing the crop at different rates and times. The arithmetic does not decide that a crop responds identically to them or endorse a particular light-dark cycle. To compare fixture placement use a spatial map, and calculate separate daily exposures for different positions if uniformity matters. For outages, run the schedule as it actually occurred alongside the plan, and keep any agriculture decision separate from estimating the missed dose.
Worked examples
Scenario values are illustrative. Model examples use the identified product records and their documented limits.
Steady under-shelf lamp
Illustrative Scenario
An illustrative fixture delivers 180 µmol/m²/s for 14 hours.
| Row | PPFD (µmol/m²/s) | Hours |
|---|---|---|
| 1 | 180 | 14 |
How the result follows
180 × 14 × 0.0036 equals 9.072 mol/m²/day.
What the tool returned
Calculated
| Result field | Observed value |
|---|---|
| Total hours | 14 |
| Total DLI (mol/m²/day) | 9.072 |
What to do with the result
Use the quick form for a steady interval; the period list can record the same value.
Scope of this example
Measured or assumed intensity is specific to the receiving surface.
A brighter start, a gentler finish
Illustrative Scenario
An illustrative schedule runs at 300 for six hours and 120 for ten hours.
| Row | PPFD (µmol/m²/s) | Hours |
|---|---|---|
| 1 | 300 | 6 |
| 2 | 120 | 10 |
How the result follows
Contributions are 6.48 and 4.32, giving 10.8 mol/m²/day.
What the tool returned
Calculated
| Result field | Observed value |
|---|---|
| Total hours | 16 |
| Total DLI (mol/m²/day) | 10.8 |
| Rows 2 · Dli | 4.32 |
What to do with the result
The shorter, brighter block contributes more photons.
Scope of this example
Equal clock blocks are unnecessary; each reading is weighted by its own duration.
Window plus lamp overlap
Illustrative Scenario
A two-hour illustrative combined period of 350 is followed by eight lamp-only hours at 160 and a confirmed fourteen-hour dark period.
| Row | PPFD (µmol/m²/s) | Hours |
|---|---|---|
| 1 | 350 | 2 |
| 2 | 160 | 8 |
| 3 | 0 | 14 |
How the result follows
Add 2.52, 4.608 and zero to obtain 7.128 mol/m²/day.
What the tool returned
Calculated
| Result field | Observed value |
|---|---|
| Total hours | 24 |
| Total DLI (mol/m²/day) | 7.128 |
What to do with the result
Use the combined intensity once for the overlap and keep darkness as an explicit record.
Scope of this example
No unrecorded daytime intervals can be inferred from this schedule.
Two hours lost to an outage
Illustrative Scenario
A planned illustrative twelve-hour block at 240 instead runs for ten hours; two interrupted hours have zero exposure.
| Row | PPFD (µmol/m²/s) | Hours |
|---|---|---|
| 1 | 240 | 10 |
| 2 | 0 | 2 |
How the result follows
240 × 10 × 0.0036 is 8.64; a full twelve hours would have supplied 10.368.
What the tool returned
Calculated
| Result field | Observed value |
|---|---|
| Total hours | 12 |
| Total DLI (mol/m²/day) | 8.64 |
What to do with the result
The known missed exposure is 1.728 mol/m² for this interval.
Scope of this example
The comparison does not justify extending the next day's schedule.
Changing light during inspection
Illustrative Scenario
An illustrative logged window has one hour at 100, three at 225 and six at 50.
| Row | PPFD (µmol/m²/s) | Hours |
|---|---|---|
| 1 | 100 | 1 |
| 2 | 225 | 3 |
| 3 | 50 | 6 |
How the result follows
Multiply each PPFD by its own hours to obtain 0.36 + 2.43 + 1.08 = 3.87.
What the tool returned
Calculated
| Result field | Observed value |
|---|---|
| Total hours | 10 |
| Total DLI (mol/m²/day) | 3.87 |
What to do with the result
The plain mean of the three intensity numbers would overemphasize the highest log entry.
Scope of this example
Keep a separate record for the rest of the clock day if it was not included.
Read next
Related original case studies
- A Split Lighting Day Is a Different Plan, Even at the Same DLI
Compares split and continuous schedules with equal daily totals.
- A Fluctuating Light Log Needs Time Weights Before a Daily Total
Explains why averaging readings without regard to duration changes the integral.
- An Outage Record Should Show the Lost Interval, Not Promise Recovery
Uses the lost interval to keep a planned schedule distinct from the one that actually occurred.
Technical guides
- Daily Light Integral Explained
Connects measured photon arrival over time with the daily integral and practical measurement limits.
- Understanding PPF and PPFD
Distinguishes the PPFD input here from fixture photon output.
Sources and equipment records
References for the method
- Apogee Instruments: PPFD to DLI conversion
PPFD × seconds / 1,000,000; hours × 0.0036